Home›Resources›Case Studies
CO-FIRING CASE STUDIES

Proven Engineering Case Studies for Mandated Biomass Co-Firing

From CAPEX-light boiler conversion planning to bulk pellet handling and CAQM mandate compliance—explore our actionable, data-backed case studies built specifically for thermal power plant engineers, GENCO procurement officers, and industrial decision-makers.

The Thermal Power Plant Boiler Conversion & Co-Firing Handbook
Boiler Retrofitting

The Thermal Power Plant Boiler Conversion & Co-Firing Handbook

A comprehensive engineering guide covering every critical step of transitioning an industrial coal boiler to a 5-7% biomass pellet co-firing system without risking thermal efficiency drops, boiler slagging, or incurring heavy capital expenditures (CAPEX).

20 min readJun 2026
High-GCV Biomass Pellet Bulk Storage & Handling Guide
Fuel Logistics

High-GCV Biomass Pellet Bulk Storage & Handling Guide

Proven best practices for storing, transporting, and feeding non-torrefied biomass pellets at an industrial scale to prevent moisture degradation (keeping it strictly <10%), minimize fines, and maximize continuous combustion efficiency.

15 min readMay 2026